Final | 12/12/2006 | 12/12/2006 | 12/12/2006 | A | PASS |
Jack Frank
|
|
|
ok for all work but final, owner is taking over job on PM#ele06-04552
|
Electrical Rough-In | 11/7/2006 | 11/7/2006 | 11/7/2006 | P | PASS |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Curtis Dunham ok
|
Electrical Rough-In | 10/31/2006 | 10/31/2006 | 10/31/2006 | P | FAIL |
Jack Frank
|
|
|
Curtis; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt corr. fee due, 300.14 shall provide 6" free length conductor for splices all locations, 300.4(D)11/4" for cables parallel to studs, 250.148 grd all metal boxes B C C complete all makeup, 312.5 use plastic conn for GEC called
|
Permanent Service | 8/30/2006 | 8/30/2006 | 8/30/2006 | P | PASS |
Bob Reichert
|
|
|
curtis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles p/s u/g rec ok
|
Rough-In Permanent Service | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | CANC |
Bob Reichert
|
|
|
service is being changed out today Curtis Dunham; Phone #: ###-#### Internet Inspection Request from: Curtis Dunham see ri
|
Electrical Rough-In | 8/28/2006 | 8/28/2006 | 8/28/2006 | P | PASS |
Bob Reichert
|
|
|
service is being changed out today Curtis Dunham; Phone #: ###-#### Internet Inspection Request from: Curtis Dunham u/g only ok to cover
|
Conference | 8/24/2006 | 8/25/2006 | 8/25/2006 | A | DONE |
Bob Reichert
|
|
|
curtis - call prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley told contr u/g shall be inspected and concrete encased gec shall be supplied
|