Final | 12/5/2006 | 12/5/2006 | 12/5/2006 | P | PASS |
Bob Reichert
|
|
|
code marks on boiler ok, ok to final, signed occ card
|
Final | 11/20/2006 | 11/20/2006 | 11/20/2006 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/20/2006 at 7:02:47 AM. Contact: ###-####. met contr, left corr notice,signed t/o card, nec 110.3(B) and BCC 4-05-33(A)(B) all electric equipment shall be listed by a nationally recognized testing laboratory (boiler), Note; correction shall be made within 2 weeks or further action will be taken, such as removal of power
|
Electrical Rough-In | 11/17/2006 | 11/17/2006 | 11/17/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/17/2006 at 6:45:07 AM. Contact: ###-####. ceiling main area ok to cover
|
Permanent Service | 11/15/2006 | 11/16/2006 | 11/16/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/15/2006 at 7:25:14 PM. Contact: ###-####. p/s u/g n ok, new line-up
|
Electrical Rough-In | 11/13/2006 | 11/13/2006 | 11/13/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/13/2006 at 6:54:34 AM. Contact: ###-####.rear ceiling only ok to cover
|
Electrical Rough-In | 10/30/2006 | 10/30/2006 | 10/30/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/30/2006 at 6:53:51 AM. Contact: ###-####. lobby walls and clg, bakery ceiling ok to cover
|
Electrical Rough-In | 10/26/2006 | 10/27/2006 | 10/27/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/26/2006 at 4:51:27 PM. Contact: ###-####. baths, mech room walls, lighting control wall, soffits ok to cover
|
Electrical Rough-In | 10/25/2006 | 10/25/2006 | 10/25/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/25/2006 at 7:20:31 AM. Contact: ###-####. main area soffits only ok to cover
|
Electrical Rough-In | 10/23/2006 | 10/23/2006 | 10/23/2006 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/23/2006 at 11:27:41 AM. Contact: ###-####. walls ok by office hall and rooms east side of hall
|
Electrical Rough-In | 10/20/2006 | 10/20/2006 | 10/20/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/20/2006 at 6:41:22 AM. Contact: ###-####. ok to cover walls prep kitchen and mgr's office only
|
Electrical Rough-In | 10/17/2006 | 10/17/2006 | 10/17/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/17/2006 at 7:18:17 AM. Contact: ###-####. main cook-line wall ok to cover
|
Electrical Rough-In | 10/12/2006 | 10/12/2006 | 10/12/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/12/2006 at 6:59:32 AM. Contact: ###-####. perimeter walls ok to cover
|
Electrical Rough-In | 10/5/2006 | 10/6/2006 | 10/6/2006 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/5/2006 at 1:17:12 PM. Contact: ###-####. north 1/2 main floor ok to cover u/g, 3 sign boxes on mezz ok to cover
|
Electrical Rough-In | 10/3/2006 | 10/4/2006 | 10/4/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/3/2006 at 11:44:30 AM. Contact: ###-####. south 1/2 u/g ok to cover- entry area
|
Electrical Rough-In | 9/28/2006 | 9/29/2006 | 9/29/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/28/2006 at 2:13:08 PM. Contact: ###-####. ok to pour gec, u/g ok to pour
|
Conference | 9/5/2006 | 9/5/2006 | 9/5/2006 | P | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/5/2006 at 11:11:42 AM. Contact: ###-####. wrong permit, see ele06-02254
|