Temporary Service | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Mike Kinnear
|
|
|
We have made the corrections are ready for the re-inspection of the temporary service. Thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH t/s u/g n ok
|
Temporary Service | 9/18/2006 | 9/19/2006 | 9/19/2006 | A | FAIL |
Jack Frank
|
|
|
We have a temporary pole at the Idaho Power box that is ready for inspection for temporary power. Thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH corr called 250.53 drive grd rod flush, 250.24 terminate GEC to neutral bus, and install bond strap, use plastic conn for GEC
|
Rough-In Permanent Service | 9/8/2006 | 9/8/2006 | 9/8/2006 | P | FAIL |
Mike Kinnear
|
|
|
WE ARE READY TO HAVE PERMANENT SERVICE TO THE NEW 200-AMP UNDERGROUND SO WE CAN USE THE NEW SERVICE AND TEMPORARY OUTLETS UNDER THE PANEL TO CONTINUE WITH CONSTRUCTION. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH nec110.3 listing & labeling panel & gfci boxes & covers are for interior use called
|