Final | 3/6/2007 | 3/6/2007 | 3/6/2007 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/6/2007 at 8:25:48 AM. Contact: ###-####. ok
|
Final | 2/21/2007 | 2/22/2007 | 2/22/2007 | A | NH |
Jack Frank
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt notice posted
|
Permanent Service | 9/18/2006 | 9/19/2006 | 9/19/2006 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/18/2006 at 1:24:36 PM. Contact: ###-####. see rip
|
Rough-In Permanent Service | 9/19/2006 | 9/19/2006 | 9/19/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/18/2006 at 1:24:36 PM. Contact: ###-####. corrections made, ric ok, p/s u/g n ok
|
Rough-In Permanent Service | 9/12/2006 | 9/13/2006 | 9/13/2006 | A | FAIL |
Bob Reichert
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley called left corr notice, nec 312.5 all conductors entering enclosures shall have abrasion protection, 334.30 nm cable shall not be stapled on edge, 314.20 boxes shall be flush with finished surface, 250.64(D) gec shall be tapped outside box, not run thru, 300.4(D) edge of nm cable shall be 1 1/4" from edge of framing member, BCC job id sticker shall be posted, approved set of plans on job(done)
|