Final | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Mike Kinnear
|
|
|
Phone #: ###-#### Internet Inspection Request from: Nikki Day ok final
|
Electrical Rough-In | 9/18/2006 | 9/18/2006 | 9/18/2006 | P | PASS |
Bob Reichert
|
|
|
cieling re-inspection; Phone #: ###-#### Internet Inspection Request from: Nikki Day ok to cover ceiling only
|
Electrical Rough-In | 9/13/2006 | 9/13/2006 | 9/13/2006 | P | FAIL |
Bob Reichert
|
|
|
Request for cieling inspectoin. Building is occupied; Phone #: ###-#### Internet Inspection Request from: Nikki Day called left corr notice, nec 300.4(D) edge of mc cable shall be 1 1/4" from edge of framing member, 300.30(B) mc cable shall be secured within 12" of box, 110.12(A) unused openings in box shall be closed, 725.3(B) abandoned cl2 and cl3 cable shall be removed, BCC lv wiring shall not use grid as support, no violations shall be retained
|