Final | 11/13/2006 | 11/14/2006 | 11/14/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/13/2006 at 2:59:05 PM. Contact: ###-####. ok to final
|
Electrical Rough-In | 10/5/2006 | 10/5/2006 | 10/5/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/5/2006 at 6:57:14 AM. Contact: ###-####. u/g post light
|
Rough-In Permanent Service | 10/2/2006 | 10/2/2006 | 10/2/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/2/2006 at 7:01:35 AM. Contact: ###-####. r/i p/s u/g new ok
|
Rough-In Permanent Service | 9/27/2006 | 9/29/2006 | 9/29/2006 | A | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 9/27/2006 at 3:56:43 PM. Contact: ###-####. corr. called 300.4(A)(1) nail plates ,110.14(A) lug at bond bushing loose, u/g for post light covered before inspection
|