Final | 12/4/2006 | 12/6/2006 | 12/6/2006 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/4/2006 at 11:41:12 AM. Contact: ###-####. ok
|
Electrical Rough-In | 10/5/2006 | 10/6/2006 | 10/6/2006 | A | FAIL |
Jack Frank
|
|
|
We wired a hot tub from the new 200 amp meter/panel.Please Final if OK. Tech/Jason/###-####. Thanks!!!; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell corr. fee due, 680.26 FPN #8 bond shall terminate at spa equip, 352.10 shall use schedule *) pvc, 406.8 needs inuse cover called
|
Rough-In Permanent Service | 9/20/2006 | 9/21/2006 | 9/21/2006 | P | CANC |
Bob Reichert
|
|
|
We replaced the 100 amp meter/main with a 200 amp meter/panel and connected the hot tub to this new panel. Please notify Idaho Power when you are finished so they will re-energize the service.We will be ready for an early PM inspection. THANKS!!!!!!!!! (6090934m); Phone #: ###-#### Internet Inspection Request from: Dan Mitchell wrong type insp, see p/s
|
Permanent Service | 9/21/2006 | 9/21/2006 | 9/21/2006 | P | PASS |
Bob Reichert
|
|
|
We replaced the 100 amp meter/main with a 200 amp meter/panel and connected the hot tub to this new panel. Please notify Idaho Power when you are finished so they will re-energize the service.We will be ready for an early PM inspection. THANKS!!!!!!!!! (6090934m); Phone #: ###-#### Internet Inspection Request from: Dan Mitchell p/s u/g rec ok
|