Final | 1/18/2007 | 1/19/2007 | 1/19/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/18/2007 at 9:11:00 PM. Contact: ###-####.
|
Electrical Rough-In | 11/28/2006 | 11/28/2006 | 11/28/2006 | P | PASS |
Jim Schmer
|
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 7:58:34 AM. Contact: ###-####.
|
Electrical Rough-In | 11/27/2006 | 11/27/2006 | 11/27/2006 | P | NR |
Mike Kinnear
|
|
|
chris ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith job not ready t/w home owner 6inch free conductor, 20amp wire & curc. for bathrm. & arc fault brker for bedroom.
|
Electrical Rough-In | 11/24/2006 | 11/24/2006 | 11/24/2006 | P | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 11/24/2006 at 8:12:48 AM. Contact: ###-####. conf with home owner 20amp cur. for bathrm, free length of conducter, 8 inch stapling, wall spacing, proper recess lights, & needs service change or move the hot water heater.
|
Conference | 10/23/2006 | 10/24/2006 | 10/24/2006 | A | PART |
Pat Lass
|
|
|
christopher; Phone #: ###-#### Internet Inspection Request from: Darla Downs bed bath and office wiring was discussed.
|