Final | 12/1/2006 | 12/4/2006 | 12/4/2006 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/1/2006 at 4:48:14 PM. Contact: ###-####. called contr, survey nec 408.4 circuit directory shall be be concise for each circuit and specific for its purpose, ok to final
|
Permanent Service | 12/1/2006 | 12/4/2006 | 12/1/2006 | A | CANC |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 12/1/2006 at 4:46:34 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Dec 1 2006 4:53PM.
|
Final | 11/20/2006 | 11/21/2006 | 11/21/2006 | P | NR |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 11/20/2006 at 5:32:18 PM. Contact: ###-####. conf with alan
|
Final | 11/20/2006 | 11/20/2006 | 11/20/2006 | P | CANC |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 11/20/2006 at 7:38:15 AM. Contact: ###-####. t/w alan canc.
|
Permanent Service | 11/3/2006 | 11/6/2006 | 11/6/2006 | P | PASS |
Mike Kinnear
|
|
|
allen ###-#### p/s o/h n ok
|