Final | 12/13/2006 | 12/14/2006 | 12/14/2006 | A | PASS |
Pat Lass
|
|
|
WE HAVE MADE THE COORRECTIONS AND THE HVAC CONTRACTOR WILL BE THERE FIRST THING IN THE MORNING TO RE-ROUTE THE DUCT WORK. THANK YOU.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH
|
Final | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | FAIL |
Bob Reichert
|
|
|
WE HAVE MADE OUR COORRECTIONS AND ARE READY FOR THE COMPLETION OF THE FINAL INSPECTION. ; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH called, added to exst corr notice, breaker blanks shall be put in panel spaces, mc and emt shall be strapped, Johnson controller is to be abandoned, still has duct over panels, so left corr notice on door to mech room.
|
Final | 12/4/2006 | 12/6/2006 | 12/6/2006 | P | FAIL |
Bob Reichert
|
|
|
READY FOR A FINAL INSPECTION FOR THIS PROJECT, ANY QUESTIONS PLEASE CONTACT US AT THE SHOP.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH called left message, left corr notice, nec 408.4 circuit directory shall be completed, 110.16 hazard signs shall be installed for arc flash, 110.26(F)(1) there shall be no ducts in dedicated panel space, 408.38 panelboards shall be deadfront, Note: floor is flooded, need to see when dry for other possible corrections
|
Electrical Rough-In | 11/15/2006 | 11/16/2006 | 11/16/2006 | A | PASS |
Bob Reichert
|
|
|
INSPECTION FOR TRENCH FOR COVER IN AM; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH u/g ok to cover
|
Conference | 11/7/2006 | 11/8/2006 | 11/8/2006 | A | DONE |
Bob Reichert
|
|
|
WE WOULD LIKE TO HAVE YOU LOOK AT THE GROUNDING AND BONDING OF THE SYSTEM DUE TO THE FACT THERE IS A POLY PIPE WATER MAIN IN TO THE BUILDING. KEVIN IS ON-SITE AT ###-####; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH met and discussed service grounding, pvc water incoming, told to drive 2 ground rods
|