Final | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/17/2006 at 8:47:21 AM. Contact: ###-####. corr made, signed struct card
|
Final | 11/16/2006 | 11/17/2006 | 11/17/2006 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/16/2006 at 11:18:14 AM. Contact: ###-####. met elect, need to see cable supports, finish grid, panel schedules, no violations shall be retained,
|
Conference | 11/15/2006 | 11/16/2006 | 11/16/2006 | P | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/15/2006 at 11:43:09 AM. Contact: ###-####. done in am
|
Conference | 11/15/2006 | 11/16/2006 | 11/16/2006 | A | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 11/15/2006 at 2:49:07 PM. Contact: ###-####. told elect to open clg for inspection and no violations shall be retained
|