Final | 3/7/2007 | 3/7/2007 | 3/7/2007 | P | PASS |
Pat Lass
|
|
|
Phone #: ###-####
|
Rough-In Permanent Service | 12/6/2006 | 12/7/2006 | 12/7/2006 | A | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton P/S O/H R Ok
|
Rough-In Permanent Service | 12/5/2006 | 12/6/2006 | 12/6/2006 | A | FAIL |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton corr. called 250.66 &104(A)(1) needs #4 copper to bond water, 250.24(A)(5) remove bond screw at subpanel and water bond
|
Electrical Rough-In | 12/6/2006 | 12/6/2006 | 12/6/2006 | A | PART |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton u/g ok only
|
Rough-In Permanent Service | 11/30/2006 | 12/1/2006 | 12/1/2006 | A | PART |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton electrode is ok to backfill.
|
Rough-In Permanent Service | 11/29/2006 | 11/30/2006 | 11/30/2006 | A | PART |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton electrode ok for concrete.
|
Electrical Rough-In | 11/28/2006 | 11/29/2006 | 11/29/2006 | A | PASS |
Pat Lass
|
|
|
Please call Brandon upon arrival.; Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton R/I Ok requires electrode. called and told contractor to change room count to 4
|