Final | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PASS |
Bob Reichert
|
|
|
ok to final, signed occ card
|
Final | 2/6/2007 | 2/7/2007 | 2/7/2007 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 2/6/2007 at 2:40:02 PM. Contact: ###-####. all ok except chandilier over cash wrap, will sign card when come back next week
|
Electrical Rough-In | 1/24/2007 | 1/25/2007 | 1/25/2007 | A | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/24/2007 at 2:15:50 PM. Contact: ###-####. ok to cover dropped clg only
|
Permanent Service | 1/22/2007 | 1/22/2007 | 1/22/2007 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/22/2007 at 7:16:05 AM. Contact: ###-####. p/s ,exst meter pak, n, ok, 4 meters req'd
|
Electrical Rough-In | 1/5/2007 | 1/5/2007 | 1/5/2007 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/5/2007 at 7:26:47 AM. Contact: ###-####. ok to cover walls and hard lids only
|
Electrical Rough-In | 12/14/2006 | 12/15/2006 | 12/15/2006 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/14/2006 at 11:36:52 AM. Contact: ###-####. underground ok
|
Conference | 12/4/2006 | 12/5/2006 | 12/4/2006 | A | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/4/2006 at 9:12:51 AM. Contact: ###-####. talked about dedicated panel space and requirement of no foreign systems in space
|