Final | 12/7/2006 | 12/7/2006 | 12/7/2006 | P | PASS |
Pat Lass
|
|
|
george ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Permanent Service | 12/7/2006 | 12/7/2006 | 12/7/2006 | P | PASS |
Pat Lass
|
|
|
george ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith P/S O/H R Ok
|
Final | 12/6/2006 | 12/7/2006 | 12/7/2006 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 12/6/2006 at 9:28:17 PM. Contact: ###-####. disconnect still not SUSE listed and GEC not bonded to niple.
|
Permanent Service | 11/29/2006 | 11/29/2006 | 11/29/2006 | P | NR |
Pat Lass
|
|
|
george; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles I could not locate the ground rods or SUSE label on the disconnect and pull-out is missing.
|