Final | 1/4/2007 | 1/4/2007 | 1/4/2007 | P | PASS |
Pat Lass
|
|
|
pl ease call 10 mins prior to inspection///steve//6th floor; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
|
Electrical Rough-In | 1/3/2007 | 1/3/2007 | 1/3/2007 | P | PASS |
Pat Lass
|
|
|
Please call 10 mins prior to appt...ceiling rough in///steve; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt ceiling rough in ok
|
Electrical Rough-In | 12/5/2006 | 12/6/2006 | 12/6/2006 | A | PART |
Pat Lass
|
|
|
Us Bank Building 6th floor south side of lobby. Walls only for cover.Call Mike Clover.If no answer call Sam @ 9410258; Phone #: ###-#### Internet Inspection Request from: Loren Ramsey walls ok
|