Final | 4/6/2007 | 4/12/2007 | 4/12/2007 | A | PASS |
Mike Kinnear
|
|
|
Mike, This is Lab remodel in bldg 4.SUP05 Phone #: ###-#### ok final
|
Final | 4/10/2007 | 4/10/2007 | 4/10/2007 | A | PASS |
Mike Kinnear
|
|
|
Mike, This is the Lab remodel you looked at when i was gone. Need to get it finaled for a move in. SUP05 Phone #: ###-#### ok final
|
Electrical Rough-In | 3/28/2007 | 3/29/2007 | 3/29/2007 | A | PASS |
Mike Kinnear
|
|
|
Mike, This is another office in bldg 4 we need to have 0.k to cover ceiling. Please contact Lauren Kencke at 7072013, ok cover ceiling
|
Electrical Rough-In | 3/14/2007 | 3/15/2007 | 3/15/2007 | A | PASS |
Mike Kinnear
|
|
|
Mike, Need a permission to cover ceiling. SUP05 Phone #: ###-#### ok cover ceiling only
|