Final | 2/8/2008 | 2/11/2008 | 2/11/2008 | A | PASS |
Pat Lass
|
|
|
This is for final inspection on building one. Please call Lonnie at ###-#### with any questions. Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa
|
ELE-Aging Inspection | 2/5/2008 | 2/5/2008 | 2/5/2008 | | NR |
Pat Lass
|
|
|
suc
|
ELE-Aging Inspection | 12/5/2007 | 12/5/2007 | 12/6/2007 | | NR |
Pat Lass
|
|
|
suc
|
Electrical Rough-In | 10/3/2007 | 10/3/2007 | 10/3/2007 | P | PART |
Pat Lass
|
|
|
This inspection is for the riser rooms of all 4 buildings, espicially building #1, we need to know if the fire alarm cabinet clearences are going to work for all (4) buildings. This is more of a conference and clarification on how to proceed. Lonnie should be on site if not Mel the general contractor is. His number is ###-####. Thanks Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa
|
Electrical Rough-In | 9/24/2007 | 9/24/2007 | 9/24/2007 | P | PART |
Pat Lass
|
|
|
inspect underground for street lightng. Call Lonnie at ###-#### with any questions. Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa U/G allong 15th st OK
|
Electrical Rough-In | 9/20/2007 | 9/21/2007 | 9/21/2007 | P | CANC |
William E Thomas
|
|
|
Call lonnie with questions. This is for underground inspection for pole lights. Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa1 1. need to see all of theconduit . .
|
Electrical Rough-In | 6/18/2007 | 6/18/2007 | 6/19/2007 | P | PASS |
Jack Frank
|
|
|
Rough in for bldg. 1 Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa r/i ok all 4 units
|
Permanent Service | 6/5/2007 | 6/5/2007 | 6/5/2007 | P | PASS |
Jack Frank
|
|
|
Permanent Service Inspection for Building #1. Lonnie ###-#### or Mike ###-#### should be on site. Thanks Phone #: ###-#### Internet Inspection Request from: Daniel p/s u/g new ok
|
Electrical Rough-In | 6/5/2007 | 6/5/2007 | 6/5/2007 | P | NR |
Jack Frank
|
|
|
Rough-in Inspection for Building #1 only. Lonnie ###-#### should be on site along with Mike ###-####. Thanks Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa met contr conference on code requirements
|
Conference | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PART |
Pat Lass
|
|
|
Pat i will be in bldg #1 please call me if you cannot find me. Lonnie Phone #: ###-#### talked about panel locations
|
Electrical Rough-In | 1/8/2007 | 1/9/2007 | 1/9/2007 | A | PART |
Pat Lass
|
|
|
Uffer inspection for building #1 of 4 for Grand Ave. Homes. Phone #: ###-#### electrode ok
|