Final | 3/5/2007 | 3/6/2007 | 3/6/2007 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/5/2007 at 9:20:25 PM. Contact: ###-####. ok to final, signed occ card
|
Final | 3/5/2007 | 3/5/2007 | 3/5/2007 | P | PART |
Bob Reichert
|
|
|
late pm???if possible-- john ###-#### need to see some recpts up front and panel schedules, rest ok
|
Conference | 3/2/2007 | 3/2/2007 | 3/2/2007 | P | DONE |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/2/2007 at 7:33:42 AM. Contact: ###-####. looked at lighting requirement and cord connections, elect room , main area for any changes that may be required prior to final
|
Electrical Rough-In | 1/29/2007 | 1/29/2007 | 1/29/2007 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/29/2007 at 9:01:06 AM. Contact: ###-####. ok to cover front area walls only
|
Electrical Rough-In | 1/25/2007 | 1/26/2007 | 1/26/2007 | P | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 1/25/2007 at 6:20:31 PM. Contact: ###-####. back walls ok
|
Electrical Rough-In | 1/18/2007 | 1/18/2007 | 1/18/2007 | P | PASS |
Bob Reichert
|
|
|
john - ###-#### u/g ok to cover, west floor box has 3 90's
|