Final | 3/15/2007 | 3/15/2007 | 3/15/2007 | P | FAIL |
Pat Lass
|
|
|
Work performed by Kyle Sharp. Phone #: ###-#### Provide lockout for breaker that feeds baseboard heaters. update directory and remove recep. from above baseboard heater.
|
Conference | 2/1/2007 | 2/1/2007 | 2/2/2007 | A | PASS |
Jim Schmer
|
|
|
talked with tony (str. insp.) about electrical permit. Talked to Alloway about not tying the electrical permit with structural permit. If not, stop worked and double fee will be posted until done, this was there first warning. This was tied to structural by Barb this one time.
|
Electrical Rough-In | 1/19/2007 | 1/22/2007 | 1/22/2007 | A | PASS |
William E Thomas
|
|
|
Work performed by Kyle Sharp. Phone #: ###-#### 1. laundry room, bathroom ok for cover
|