Final | 1/25/2007 | 1/29/2007 | 1/29/2007 | A | PASS |
Pat Lass
|
|
|
Work performed by Nick Felsted. Phone #: ###-####
|
Permanent Service | 1/23/2007 | 1/24/2007 | 1/23/2007 | A | PART |
Pat Lass
|
|
|
Work performed by Nick Felsted. Phone #: ###-#### on final check clearance in front of service guy kit and removal of old service drop to garage. corrections to be made within 3 work days P/S O/H R Ok
|
Permanent Service | 1/22/2007 | 1/23/2007 | 1/23/2007 | A | NH |
Pat Lass
|
|
|
Work performed by Nick Felsted. Phone #: ###-#### had violations outside and called Nick and went over the problems i found clearance grounding bushing on 2 in pipe and 2nd drop to building also talked to him about 4 wire to range and dryer and isolation of neutrals in sub panel.
|