Final | 4/4/2007 | 4/4/2007 | 4/4/2007 | P | PASS |
William E Thomas
|
|
|
Bob please call first before going out ; Phone #: ###-#### Internet Inspection Request from: Darla Downs talked with bob and jim about the needed corrections, final ok
|
Final | 2/12/2007 | 2/12/2007 | 2/12/2007 | P | FAIL |
Bob Reichert
|
|
|
chris ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith talked to service mgr and salesman, blower assy not listed as an ass'y by a nationally recognized testing lab. Control panel is listed for 3 options, but controlled items not listed.
|
Final | 1/31/2007 | 1/31/2007 | 1/31/2007 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/31/2007 at 9:05:21 AM. Contact: ###-####. still need correction for labels, signed t/o card, for 2 weeks per corr notice
|
Final | 1/29/2007 | 1/30/2007 | 1/30/2007 | P | FAIL |
Bob Reichert
|
|
|
carl; Phone #: ###-#### Internet Inspection Request from: Darla Downs called contr, left corr notice, BCC 4-05-33(A)(B) all equipment shall be listed by a nationally recognized testing laboratory, nec 110.3(A)(B) all elect equip shall be listed and labelled, NOTE: corrections shall be made in 2 weeks or further action will be taken, such as removal of power
|