Final | 5/25/2007 | 5/25/2007 | 5/25/2007 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 5/25/2007 at 8:17:03 AM. Contact: ###-####. ok to final, signed occ card
|
Rough-In Permanent Service | 3/19/2007 | 3/20/2007 | 3/20/2007 | A | NR |
Mike Kinnear
|
|
|
Zane Panel B; Phone #: ###-#### Internet Inspection Request from: Stacie Backus t/w zane he needs to get another electrical permit for panel b service & tie it into this bld permit. dan stewart 395= 7873 is researching for the city of boise
|
Rough-In Permanent Service | 3/8/2007 | 3/9/2007 | 3/9/2007 | A | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 3/8/2007 at 10:22:32 AM. Contact: ###-####. ri ok p/s u/g n ok just needs a meter
|
Electrical Rough-In | 1/29/2007 | 1/30/2007 | 1/30/2007 | A | PART |
Pat Lass
|
|
|
zane Note: Floor box in concrete; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Floor box in concrete ok
|