Final | 1/13/2009 | 1/13/2009 | 1/13/2009 | P | PASS |
Pat Lass
|
|
|
|
ELE-Aging Inspection | 1/7/2009 | 1/7/2009 | 1/8/2009 | | NR |
Pat Lass
|
|
|
gave them 10 days to get corrections made
|
Electrical Rough-In | 11/3/2008 | 11/4/2008 | 11/4/2008 | P | FAIL |
Pat Lass
|
|
|
ready for inspection, Nancy Irwin ###-#### is the customer Phone #: ###-#### Internet Inspection Request from: gary batten 314.23 Supports. 330.30 Securing and Supporting. 300.11 Securing and Supporting.
|
ELE-Aging Inspection | 10/29/2008 | 10/29/2008 | 11/3/2008 | | NR |
Pat Lass
|
|
|
will schedual for tomorrow
|
ELE-Aging Inspection | 8/27/2008 | 8/27/2008 | 8/28/2008 | | NH |
Pat Lass
|
|
|
requires ceiling access
|
ELE-Aging Inspection | 5/23/2008 | 5/23/2008 | 5/27/2008 | | NR |
Pat Lass
|
|
|
called mike johnson and he said that he would make arrangements
|
Final | 2/23/2007 | 2/28/2007 | 2/28/2007 | P | NR |
Mike Kinnear
|
|
|
Call Nancy Irwin ###-#### to make sure she is at the job site. Work performed by Tony Norton. Phone #: ###-#### called tony he to meet an inspector & show us the work he did above the ceiling grid
|