Final | 11/1/2007 | 11/2/2007 | 11/2/2007 | P | PASS |
Pat Lass
|
|
|
furniture feeds done. UL labels all installed. Phone #: ###-#### Internet Inspection Request from: Loren Ramsey
|
DOC - Permit Finaled | 11/2/2007 | 11/2/2007 | 11/2/2007 | P | PASS |
Pat Lass
|
|
|
|
Conference | 10/29/2007 | 11/1/2007 | 11/1/2007 | A | PART |
Pat Lass
|
|
|
ATTENTION:BILL THOMAS the UL labeling inspector will be flying in to examine and approve the furniture at the Healthwise complex talked about furniture Thursday 11/1/07 this week. I want to have Mountain Power, and the GC all present to get this issue resolved and completed. Thank you for the help thus far. Loren ###-#### Phone #: ###-#### Internet Inspection Request from: Loren Ramsey
|
Final | 10/16/2007 | 10/17/2007 | 10/17/2007 | P | PART |
William E Thomas
|
|
|
call Dave in the AFTERnoon for a final for Healthwise building. Thank you Phone #: ###-#### Internet Inspection Request from: Loren Ramsey . 1. The only out standing issue is yhe office furniture. It only has a UR label, no label for the assembly. . . 2. the rest of the building was fine. .
|
Electrical Rough-In | 9/18/2007 | 9/19/2007 | 9/19/2007 | A | PART |
Pat Lass
|
|
|
dave Phone #: ###-#### ceiling ok
|
Electrical Rough-In | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | PART |
Mike Kinnear
|
|
|
Dave Phone #: ###-#### ok cover ceiling 2nd floor only
|
Electrical Rough-In | 9/12/2007 | 9/13/2007 | 9/13/2007 | A | NR |
Pat Lass
|
|
|
DAVE nOTE: CEILING Phone #: ###-#### remove ceiling tiles for inspection
|
Electrical Rough-In | 7/18/2007 | 7/19/2007 | 7/19/2007 | A | PART |
Pat Lass
|
|
|
dave Phone #: ###-#### ANOP
|
Electrical Rough-In | 6/26/2007 | 6/27/2007 | 6/27/2007 | A | PART |
William E Thomas
|
|
|
dave Phone #: ###-#### under raised floor ok
|
Permanent Service | 6/19/2007 | 6/20/2007 | 6/20/2007 | A | PASS |
William E Thomas
|
|
|
dave Note: also wall Phone #: ###-#### ri ok as noted on prints p/s u/g new/reconnect ok
|
Electrical Rough-In | 6/13/2007 | 6/13/2007 | 6/13/2007 | P | PASS |
William E Thomas
|
|
|
dave Note: wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles as noted on prints ok to cover
|
Electrical Rough-In | 6/12/2007 | 6/13/2007 | 6/13/2007 | A | PASS |
William E Thomas
|
|
|
Dave ; Phone #: ###-#### Internet Inspection Request from: Darla Downs as noted on prints ok
|
Electrical Rough-In | 5/2/2007 | 5/3/2007 | 5/3/2007 | A | PASS |
Pat Lass
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman
|
DOC - Permit Finaled | 5/3/2007 | 5/3/2007 | 5/3/2007 | P | PASS |
Pat Lass
|
|
|
|
Electrical Rough-In | 3/28/2007 | 3/28/2007 | 3/28/2007 | P | PART |
Pat Lass
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Stacie Backus anop
|
Electrical Rough-In | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | PART |
Pat Lass
|
|
|
inspect pvc underground, under new slab. thanks! call Dave Tolan Phone #: ###-#### ANOP
|
Electrical Rough-In | 3/5/2007 | 3/6/2007 | 3/6/2007 | A | PASS |
William E Thomas
|
|
|
Attn: Bill Thomas...Please inspect aa soon as possible in a.m ...early. Waiting for inspection, general needs to pour concrete asap! Thank you. Loren Ramsey Phone #: ###-#### ok to pour slab over conduits
|
Electrical Rough-In | 2/21/2007 | 2/22/2007 | 2/22/2007 | A | PART |
Pat Lass
|
|
|
Please check U-fer ground install so concrete can be poured. Please try to make it by 10am if possible. Thank you call Dave Tolan Phone #: ###-#### electrode ok
|
Electrical Rough-In | 2/9/2007 | 2/12/2007 | 2/12/2007 | A | PASS |
Pat Lass
|
|
|
please call Dave for inspection on some underground. thanks Phone #: ###-####
|