Final | 7/31/2007 | 8/1/2007 | 8/1/2007 | A | PASS |
William E Thomas
|
|
|
Phone #: ###-#### Internet Inspection Request from: Steve Craig final ok
|
Final | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | FAIL |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Steve Craig corr called left message, 210.8 (1) all recepts in bath rms shall have gfci
|
Final | 7/26/2007 | 7/27/2007 | 7/27/2007 | P | NR |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Steve Craig This inspection is incomplete because not everything was working.
For a final inspection in the city of Boise all of the electrical must be complete and in working order. This includes the installation of lamps in all lighting fixtures.
210.8 Ground-Fault Circuit-Interrupter Protection for Personnel. (A) Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in (1) through (8) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (7) Laundry, utility, and wet bar sinks - where the receptacles are installed within 1.8 m (6 ft) of the outside edge of the sink
|
Electrical Rough-In | 5/9/2007 | 5/10/2007 | 5/10/2007 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Steve Craig ok to cover rest of floor heat
|
Electrical Rough-In | 5/9/2007 | 5/9/2007 | 5/9/2007 | P | PART |
Jack Frank
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall partial for elect floor heat about 1/2 of floor heat installed
|
Electrical Rough-In | 3/30/2007 | 4/2/2007 | 4/2/2007 | A | PASS |
Pat Lass
|
|
|
Phone #: ###-####
|
Electrical Rough-In | 3/29/2007 | 3/30/2007 | 3/30/2007 | A | FAIL |
Pat Lass
|
|
|
Phone #: ###-#### corrections not made
|
Electrical Rough-In | 3/28/2007 | 3/29/2007 | 3/29/2007 | P | FAIL |
Pat Lass
|
|
|
Request for rough-in inspection Phone #: ###-#### 250.148 Continuity and Attachment of Equipment Grounding Conductors to Boxes. (A) Metal Boxes. A connection shall be made between the one or more equipment grounding conductors and a metal box 300.14 Length of Free Conductors at Outlets, Junctions, and Switch Points. 314.16 Number of Conductors in Outlet, Device, and Junction Boxes, and Conduit Bodies. Boxes and conduit bodies shall be of sufficient size to provide free space for all enclosed conductors. 300.4 Protection Against Physical Damage. Where subject to physical damage, conductors shall be adequately protected. (D) Cables and Raceways Parallel to Framing Members.
334.30 Securing and Supporting. Nonmetallic-sheathed cable shall be secured by staples, cable ties, straps, hangers, or similar fittings designed and installed so as not to damage the cable at intervals not exceeding 1.4 m (41/2 ft) and within 300 mm (12 in.) of every cabinet, box, or fitting. Flat cables shall not be stapled on edge. 110.12 Mechanical Execution of Work. Electrical equipment shall be installed in a neat and workmanlike manner. (A) Unused Openings. Unused cable or raceway openings in boxes, raceways, auxiliary gutters, cabinets, cutout boxes, meter socket enclosures, equipment cases, or housings shall be effectively closed
|
Permanent Service | 2/14/2007 | 2/15/2007 | 2/15/2007 | A | PASS |
Mike Kinnear
|
|
|
Phone #: ###-#### p/s u/g n ok
|
Rough-In Permanent Service | 2/13/2007 | 2/14/2007 | 2/14/2007 | P | NR |
Mike Kinnear
|
|
|
Service change scheduled with Idaho Power for 8:00 a.m. Inspection in afternoon for reconnect. Phone #: ###-#### conf with electrician nec250.64(C) & metal water service. they to fix & recall for inspection. no ri ready yet
|