Final | 8/7/2007 | 8/7/2007 | 8/7/2007 | P | PASS |
Mike Kinnear
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cevyn Recla ok final
|
Electrical Rough-In | 7/19/2007 | 7/19/2007 | 7/19/2007 | A | PASS |
Mike Kinnear
|
|
|
Inspector requested to see pipe in trench, pipe is currently exposed and builder wants to cover back up. Phone #: ###-#### Internet Inspection Request from: Cevyn Recla ok cover under ground conduit note needs romex connector at bell box on garage
|
Electrical Rough-In | 3/13/2007 | 3/13/2007 | 3/13/2007 | P | PASS |
Mike Kinnear
|
|
|
will have underground exposed for inspection before final inspection Phone #: ###-#### ok cover ri corrections made note no under ground has been inspected yet
|
Rough-In Permanent Service | 3/9/2007 | 3/12/2007 | 3/12/2007 | A | CANC |
Bob Reichert
|
|
|
Phone #: ###-#### see ri and p/s
|
Electrical Rough-In | 3/12/2007 | 3/12/2007 | 3/12/2007 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### called contr, left corr notice, nec 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing member, 250.86 all metal boxes shall be grounded, 300.14 at least 6" of free conductor shall be provided at each box, 314.16 boxes shall be of sufficient size to provide free space for conductors (rear garage pan with 2 nm cables), BCC all make-up shall be done, all u/g shall be inspected before cover
|
Permanent Service | 3/12/2007 | 3/12/2007 | 3/12/2007 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### p/s u/g n ok
|