Final | 5/16/2007 | 5/17/2007 | 5/17/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/16/2007 at 5:09:06 PM. Contact: ###-####.
|
Rough-In Permanent Service | 3/6/2007 | 3/7/2007 | 3/7/2007 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 3/6/2007 at 6:43:10 PM. Contact: ###-####. p/s u/g new ok
|
Rough-In Permanent Service | 3/6/2007 | 3/6/2007 | 3/6/2007 | P | CANC |
William E Thomas
|
|
|
###-####-- eric
|
Permanent Service | 3/6/2007 | 3/6/2007 | 3/6/2007 | P | FAIL |
William E Thomas
|
|
|
###-####-- eric 1. grounding electrode conductor must be continuous 250.64C
|
Electrical Rough-In | 3/6/2007 | 3/6/2007 | 3/6/2007 | P | PASS |
William E Thomas
|
|
|
###-####-- eric ri ok
|