Final | 1/18/2008 | 1/22/2008 | 1/22/2008 | A | PASS |
Pat Lass
|
|
|
MIke Phone #: ###-#### final ok with a survey for gfci within 6 ft of a sink and lock-outs for heaters
|
Permanent Service | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | PASS |
Pat Lass
|
|
|
Mike ###-#### ///please call 15min - 1 hr prior to meet P/S O/H R Ok
|
Permanent Service | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | FAIL |
William E Thomas
|
|
|
Mike ###-#### . 1. meyers hubs not rated for line side grounding. .
|
Permanent Service | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | FAIL |
William E Thomas
|
|
|
Mike ###-#### . 1. meyers hubs do not have right grounding locknuts for line-side use. .
|
Electrical Rough-In | 7/20/2007 | 7/20/2007 | 7/20/2007 | P | PASS |
William E Thomas
|
|
|
r/i for 2nd floor-- mike-- ###-#### - 1. walls and ceiling only-- ri ok
|
Electrical Rough-In | 7/5/2007 | 7/6/2007 | 7/6/2007 | P | CANC |
Jim Schmer
|
|
|
mike-- ###-#### -1st floor -call 1st before insp 1 hr if possible
|
Conference | 3/21/2007 | 3/22/2007 | 3/22/2007 | A | PART |
Pat Lass
|
|
|
mike ###-####--call 1st before insp talked about new service and if romex is permitted for a six unit dwelling
|