Final | 5/31/2007 | 6/1/2007 | 6/1/2007 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 5/31/2007 at 8:43:50 PM. Contact: ###-####. ok final
|
Electrical Rough-In | 5/25/2007 | 5/25/2007 | 5/25/2007 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 5/25/2007 at 7:02:00 AM. Contact: ###-####. ok light potting correction made
|
Electrical Rough-In | 5/24/2007 | 5/24/2007 | 5/24/2007 | P | FAIL |
Pat Lass
|
|
|
rob; Phone #: ###-#### Note: check pool light Internet Inspection Request from: Cathy Chiles grounding connection not completely encapselated.
|
Electrical Rough-In | 5/10/2007 | 5/10/2007 | 5/10/2007 | P | PART |
Pat Lass
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall grid ok
|
Electrical Rough-In | 5/10/2007 | 5/10/2007 | 5/10/2007 | A | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 5/10/2007 at 7:05:17 AM. Contact: ###-####. need to have bonding grid off the ground
|
Electrical Rough-In | 3/22/2007 | 3/22/2007 | 3/22/2007 | P | PART |
Pat Lass
|
|
|
Pool george; Phone #: ###-#### Internet Inspection Request from: Stacie Backus partial bonding ok
|