Final | 6/14/2007 | 6/14/2007 | 6/14/2007 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/14/2007 at 8:27:52 AM. Contact: ###-####. called contr to fix panel schedules, ok to final
|
Electrical Rough-In | 4/10/2007 | 4/10/2007 | 4/10/2007 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/10/2007 at 6:52:06 AM. Contact: ###-####.
|
Electrical Rough-In | 4/9/2007 | 4/9/2007 | 4/9/2007 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 4/9/2007 at 6:17:33 AM. Contact: ###-####. mixing smerf and mc and nail plates and parallel protection. posted correction
|