Final | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 5/5/2008 at 7:15:47 AM. Contact: ###-####. finaled with survey for closet lights
|
Electrical Rough-In | 12/7/2007 | 12/7/2007 | 12/7/2007 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 12/7/2007 at 7:22:00 AM. Contact: ###-####. . 1. ri ok. .
|
Conference | 11/29/2007 | 11/30/2007 | 11/30/2007 | A | DONE |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 11/29/2007 at 2:56:47 PM. Contact: ###-####. . 1. they had a question about a smoke detector. .
|
ELE-Aging Inspection | 7/13/2007 | 7/13/2007 | 7/16/2007 | | NR |
Pat Lass
|
|
|
suc
|
Electrical Rough-In | 7/13/2007 | 7/13/2007 | 7/13/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 7/13/2007 at 7:15:13 AM. Contact: ###-####. tarrace lights anop
|