Final | 2/15/2008 | 2/15/2008 | 2/15/2008 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 2/15/2008 at 6:38:06 AM. Contact: ###-####. finaled with survey for required counter recep.
|
Electrical Rough-In | 8/3/2007 | 8/3/2007 | 8/3/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/3/2007 at 7:10:29 AM. Contact: ###-####.
|
Electrical Rough-In | 7/3/2007 | 7/3/2007 | 7/3/2007 | A | PART |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 7/3/2007 at 7:14:35 AM. Contact: ###-####. terrace ok
|