Final | 2/6/2008 | 2/6/2008 | 2/6/2008 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/6/2008 at 7:40:50 AM. Contact: ###-####. survey gfci 2 outlets kit., add outlet quest bath ok card signed
|
Electrical Rough-In | 9/17/2007 | 9/18/2007 | 9/18/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/17/2007 at 3:07:05 PM. Contact: ###-####.
|
Electrical Rough-In | 7/3/2007 | 7/3/2007 | 7/3/2007 | A | PART |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 7/3/2007 at 7:15:45 AM. Contact: ###-####. terrace ok
|