Final | 11/6/2007 | 11/7/2007 | 11/7/2007 | A | PASS |
Mike Kinnear
|
|
|
MITCH - WE WILL MEET @ JOB SITE Phone #: ###-#### Internet Inspection Request from: Randy Vail ok final
|
Electrical Rough-In | 7/3/2007 | 7/5/2007 | 7/5/2007 | P | PASS |
William E Thomas
|
|
|
DAVE BRADSHAW - WILL MEET @ JOBSITE Phone #: ###-#### Internet Inspection Request from: Randy Vail ri ok
|
Electrical Rough-In | 7/3/2007 | 7/3/2007 | 7/3/2007 | P | FAIL |
William E Thomas
|
|
|
DAVE BRADSHAW - WILL MEET @ JOBSITE Phone #: ###-#### Internet Inspection Request from: Randy Vail 1. BCC requires that all new commercial work be in a raceway. 2. After this correction is made a complete ri inspection shall be done. 3. The address on the permit is wrong, it should be 211 main st.
|
Conference | 4/16/2007 | 4/17/2007 | 4/17/2007 | A | PASS |
Pat Lass
|
|
|
DAVE BRADSHAW - WILL MEET @ JOBSITE Phone #: ###-#### Internet Inspection Request from: Randy Vail discussed service to back building
|