Final | 7/31/2007 | 8/1/2007 | 8/1/2007 | A | PASS |
William E Thomas
|
|
|
WE HAVE HAD OUR RUFF IN, PERM SERV AND ARE READY FOR THE FINAL. THANKS Phone #: ###-#### Internet Inspection Request from: BRENDA HURST 1. final ok.
|
Permanent Service | 6/8/2007 | 6/11/2007 | 6/11/2007 | A | PASS |
Pat Lass
|
|
|
Please inspect the work performed as a remodel, bedroom, bath, service. Thnks Phone #: ###-#### x0000 Internet Inspection Request from: BRIAN KEITH bonding jumper is on the wrong side of the dielectricts and should be checked on final/ P/S O/H R Ok
|
Electrical Rough-In | 5/14/2007 | 5/15/2007 | 5/15/2007 | P | PASS |
Pat Lass
|
|
|
rough in inspection please. thanks Phone #: ###-#### x0000 Internet Inspection Request from: BRIAN KEITH
|