Final | 8/29/2007 | 8/30/2007 | 8/30/2007 | P | PASS |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sean DeLacy
|
Final | 8/28/2007 | 8/30/2007 | 8/29/2007 | A | CANC |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sean DeLacy Inspection cancelled from web by: Sean DeLacy
|
Electrical Rough-In | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | PASS |
William E Thomas
|
|
|
cieling ok mezzanine and upper floor
|
Permanent Service | 6/27/2007 | 6/28/2007 | 6/28/2007 | A | CANC |
William E Thomas
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sean DeLacy p/s u/g n ok
|
Electrical Rough-In | 6/26/2007 | 6/27/2007 | 6/27/2007 | A | FAIL |
William E Thomas
|
|
|
BUSTER Phone #: ###-#### Internet Inspection Request from: Sean DeLacy 1.cielling shall be uncovered for inspection.
|
Electrical Rough-In | 6/5/2007 | 6/7/2007 | 6/7/2007 | A | PART |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sean DeLacy 2nd floor walls ok I talked with Dave and was tolk that this permit is for the major part of the building and the T/I permit covers the bathrooms
|
Conference | 5/29/2007 | 5/30/2007 | 5/30/2007 | A | DONE |
William E Thomas
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sean DeLacy talked about plenum rated material and what comprised the plenum
|
Conference | 5/18/2007 | 5/18/2007 | 5/18/2007 | P | PART |
Pat Lass
|
|
|
Phone #: ###-#### Internet Inspection Request from: Sean DeLacy talked about service and head space about equipment
|