Final | 8/31/2007 | 9/4/2007 | 9/4/2007 | A | PASS |
Bob Reichert
|
|
|
Ted or Boyd @###-#### are on-site contacts. Thanks Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa ok to final, signed struct card
|
Final | 8/30/2007 | 8/30/2007 | 8/30/2007 | A | PART |
William E Thomas
|
|
|
This is foe final inspection in music room and locker rooms. Call Boyd at ###-#### with any questions. Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa . 1. final in areas noted on the prints ok. .
|
Final | 8/20/2007 | 8/20/2007 | 8/20/2007 | P | PART |
Jack Frank
|
|
|
Call Boyd or Ted with any questions. At ###-#### Phone #: ###-#### Internet Inspection Request from: Daniel halls classrms, cafetteria ok
|
Electrical Rough-In | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | PART |
Jack Frank
|
|
|
Ted - this inspection is for area 3 Phone #: ###-#### ceilings anop
|
Electrical Rough-In | 8/13/2007 | 8/14/2007 | 8/14/2007 | A | PART |
Jack Frank
|
|
|
ted - area 2 ceiling Phone #: ok anop
|
Electrical Rough-In | 8/8/2007 | 8/9/2007 | 8/9/2007 | A | PART |
Jack Frank
|
|
|
Ceiling Inspection for cover of Area #1. Please contact Ted or Boyd. They should be on-site. Ted''s Cell ###-####. Thanks Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa ceilings anop
|
Permanent Service | 7/31/2007 | 8/1/2007 | 8/1/2007 | P | PASS |
Bob Reichert
|
|
|
This is for permanent service, please call Ted with any questions. ###-#### Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa p/s u/g n ok
|
Rough-In Permanent Service | 7/19/2007 | 7/20/2007 | 7/20/2007 | A | CANC |
Bob Reichert
|
|
|
Inspection of the ground for the change in permanent service before covering with concrete. Ted is the contact on site ###-#### Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa wrong type request, see ri
|
Electrical Rough-In | 7/20/2007 | 7/20/2007 | 7/20/2007 | A | PASS |
Bob Reichert
|
|
|
Inspection of the ground for the change in permanent service before covering with concrete. Ted is the contact on site ###-#### Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa ok to pour gec anop will see rest ltr
|
Electrical Rough-In | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PART |
Mike Kinnear
|
|
|
Rough-in inspection for area #2. Please contct Boyd when on-site for this inspection. His number is ###-####. Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa ok cover anop
|
Electrical Rough-In | 7/11/2007 | 7/12/2007 | 7/12/2007 | A | FAIL |
Jack Frank
|
|
|
inspect grounding.Please supply written violations Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa corr 250.52(A)(1),104(A)(1) grd or bond sprinkler water system called left message
|
Electrical Rough-In | 7/10/2007 | 7/11/2007 | 7/11/2007 | A | PASS |
William E Thomas
|
|
|
Inspect underground to transformer Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa 1. as noted on prints ok.
|
Electrical Rough-In | 7/6/2007 | 7/9/2007 | 7/9/2007 | P | CANC |
William E Thomas
|
|
|
Please contact Boyd on-site. Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa 1. as noted on prints walls ok.
|