Final | 9/21/2007 | 9/21/2007 | 9/21/2007 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Surerus looked at equipment, ETL affixed stickers, ok to final, signed occupancy card
|
Final | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | CANC |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Surerus met contr, listing lab got held up, so will call in next week to inspect some of the equipment
|
Final | 9/5/2007 | 9/5/2007 | 9/5/2007 | A | PART |
Bob Reichert
|
|
|
Temporary Occupancy Phone #: ###-#### Internet Inspection Request from: Dan Surerus signed t/o card need to see installed equipment for to final, corrections made
|
Final | 8/30/2007 | 8/30/2007 | 8/30/2007 | P | FAIL |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Surerus wiring for switches and wall fixtures in patient rms shall meet 517.13(A&B) see added r/i
|
Electrical Rough-In | 8/30/2007 | 8/30/2007 | 8/30/2007 | P | PART |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Surerus ceiling ok for tiles
|
Electrical Rough-In | 8/9/2007 | 8/9/2007 | 8/9/2007 | P | PART |
William E Thomas
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Surerus 1. walls and hard lids/soffits only 2. ri ok.
|
Permanent Service | 7/26/2007 | 7/26/2007 | 7/26/2007 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Surerus p/s exst meter pak n ok (2 meters)
|
Permanent Service | 7/25/2007 | 7/26/2007 | 7/26/2007 | A | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dan Surerus called contr, left corr notice, nec 110.26(F)(1)(b) shall provide protection to avoid damage to elect equip from condensation, leaks or breaks over panel F, BCC addressing shall be correct and posted
|