Final | 3/5/2008 | 3/5/2008 | 3/5/2008 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 3/5/2008 at 6:44:05 AM. Contact: ###-####. met contractor, ok to final, signed occupancy card
|
Electrical Rough-In | 8/3/2007 | 8/3/2007 | 8/3/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 8/3/2007 at 7:07:45 AM. Contact: ###-####.
|