Final | 7/19/2007 | 7/19/2007 | 7/19/2007 | P | PASS |
William E Thomas
|
|
|
ron chaney Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer final ok
|
Rough-In Permanent Service | 7/19/2007 | 7/19/2007 | 7/19/2007 | P | PASS |
William E Thomas
|
|
|
ron chaney Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer 1. ri ok 2. p/s o/h reconnect ok---two meters are needed for this job. 3. survey note-- needs to secure two cables to the enclosure.
|
Electrical Rough-In | 7/18/2007 | 7/18/2007 | 7/18/2007 | P | FAIL |
William E Thomas
|
|
|
electrician is Ron Chaney Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer 1. 230.24A--8ft clearance above the roof 2. 240.24D--Overcurrent devices not in closets 3. 344.30A--Guide wire support shall be within 3ft of mast head 4. 110.3A&B--Listing and Lableing of equipment for use (panels in closets have been scabbed together)
|