Final | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | PASS |
Jack Frank
|
|
|
SAM nOTE:PLEASE 30 MIN TO INSPECTION Phone #: ###-#### was done 08-23-07
|
DOC - Permit Finaled | 8/24/2007 | 8/24/2007 | 8/24/2007 | A | PASS |
Jack Frank
|
|
|
SAM nOTE:PLEASE 30 MIN TO INSPECTION Phone #: ###-#### ok
|
Final | 8/23/2007 | 8/23/2007 | 8/23/2007 | P | PASS |
Jack Frank
|
|
|
JEFF Phone #: ###-#### nOTE: PLEASE CALL 10 MIN PRIOR TO INSPECTION TO MEET ok see added p/s ok no card at site, builder has it
|
Permanent Service | 8/23/2007 | 8/23/2007 | 8/23/2007 | P | PASS |
Jack Frank
|
|
|
JEFF Phone #: ###-#### nOTE: PLEASE CALL 10 MIN PRIOR TO INSPECTION TO MEET p/s u/g new ok
|
Electrical Rough-In | 7/31/2007 | 8/1/2007 | 8/1/2007 | A | PASS |
Jim Schmer
|
|
|
This is for an inspection for buried ground rods. Contact is Mike ###-####. Phone #: ###-#### Internet Inspection Request from: Heather Packer
|
Permanent Service | 7/30/2007 | 7/30/2007 | 7/30/2007 | P | FAIL |
Jack Frank
|
|
|
perm service/final. For questions pls call Mike @ ###-#### Phone #: ###-#### Internet Inspection Request from: Heather Packer corr called needs ID stickers, prefab bld has state tag on it in mech rm but wiring is messed up panet is set over jbox behind it and access is through 3" chase nipple, grd rods shall be driven vertical if possible if not 45 degrees, if not possible then layed in trench 21/2ft deep and inspected before cover
|
Final | 7/26/2007 | 7/30/2007 | 7/30/2007 | A | CANC |
Jack Frank
|
|
|
Final - all that was done was putting a meter on building. For questions pls call Mike w/Doherty @ ###-####. Scheduled by Heather w/Doherty. Phone #: ###-#### Internet Inspection Request from: Heather Packer called needs p/s and check if building is inspected note prefab building
|