Final | 8/22/2007 | 8/23/2007 | 8/23/2007 | A | PASS |
Bob Reichert
|
|
|
final inspection for 9 exterior flood lights. please contact Doug for any questions @###-####. Thank you! Phone #: ###-#### Internet Inspection Request from: Margaret Roye ok to final
|
Electrical Rough-In | 8/9/2007 | 8/10/2007 | 8/10/2007 | P | CANC |
William E Thomas
|
|
|
trench for 9 exterior lights. Please contact Doug @ ###-####. Thanks! Phone #: ###-#### Internet Inspection Request from: Margaret Roye
|
Electrical Rough-In | 8/10/2007 | 8/10/2007 | 8/10/2007 | P | PASS |
William E Thomas
|
|
|
trench for 9 exterior lights. Please contact Doug @ ###-####. Thanks! Phone #: ###-#### Internet Inspection Request from: Margaret Roye 1. conduit and trench burial depth ok.
|
Electrical Rough-In | 8/8/2007 | 8/9/2007 | 8/9/2007 | P | NR |
Mike Kinnear
|
|
|
inspect trench for 9 exterior lights. COntact Doug Bickmore @ ###-#### Thanks Phone #: ###-#### Internet Inspection Request from: Margaret Roye conf with electrician they need to be 18 inch deep to the top of the pvc conduit & all the conduit installed.
|