Final | 1/11/2008 | 1/14/2008 | 1/14/2008 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 1/11/2008 at 8:23:41 PM. Contact: ###-####. ok
|
Final | 1/11/2008 | 1/11/2008 | 1/11/2008 | P | FAIL |
Jack Frank
|
|
|
neil Phone #: ###-#### needs recepts for N countertop kit, and right of sink island, no power to S countertop, panel schedule be specific, called
|
Electrical Rough-In | 8/8/2007 | 8/8/2007 | 8/8/2007 | P | PASS |
Jack Frank
|
|
|
neil - re-inspection Phone #: ###-#### r/i ok p/s u/g new ok
|
Rough-In Permanent Service | 8/6/2007 | 8/6/2007 | 8/6/2007 | P | NR |
Jack Frank
|
|
|
neil Phone #: ###-#### had conference with ele contr. general needs to complete all framing of walls so elect. can be installed
|