Final | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | PASS |
Bob Reichert
|
|
|
mike Phone #: ###-#### ok to final
|
Electrical Rough-In | 10/3/2007 | 10/4/2007 | 10/4/2007 | A | PASS |
Bob Reichert
|
|
|
craig Phone #: ###-#### called contr, needs some nailplates, close openings in panel, ric ok main floor only
|
Permanent Service | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PASS |
Bob Reichert
|
|
|
craig Phone #: ###-#### corrections made, p/s o/h rec ok
|
Permanent Service | 8/10/2007 | 8/10/2007 | 8/10/2007 | P | FAIL |
Bob Reichert
|
|
|
###-#### mike called, left message, left corr notice, nec 250.24(A) gec shall connect to grounded service conductor at service, 250.52(A)(1) shall connect to water pipe within 5' of entering building,250.53(D)(2) shall supplement water pipe with ground rods, 404.8 center of operating handle of breaker shall not be over 6'-7" above floor, 230.24(A) service drop conductors shall be 8' above roof
|