Final | 6/1/2009 | 6/1/2009 | 6/1/2009 | P | PASS |
Bob Reichert
|
|
|
paul Phone #: ###-#### ok to final, no esc this project
|
Electrical Rough-In | 11/2/2007 | 11/5/2007 | 11/5/2007 | A | PASS |
Pat Lass
|
|
|
paul Phone #: ###-####
|
Permanent Service | 8/13/2007 | 8/13/2007 | 8/13/2007 | P | PASS |
Pat Lass
|
|
|
paul Phone #: ###-#### P/S O/H R Ok to transfer power from house to garage.
|
Permanent Service | 8/10/2007 | 8/10/2007 | 8/10/2007 | P | FAIL |
Pat Lass
|
|
|
paul Phone #: ###-#### requires 18 ft over alley house to be disconnected from garage power when changeover takes place. violations in sub panel will be corrected also.
|