Final | 1/14/2008 | 1/14/2008 | 1/14/2008 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 1/14/2008 at 9:29:53 AM. Contact: ###-####. corrections made, signed structural card, ok to final
|
Final | 12/4/2007 | 12/5/2007 | 12/4/2007 | A | CANC |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 12/4/2007 at 2:42:34 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Dec 4 2007 3:53PM.
|
Final | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | FAIL |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 12/4/2007 at 9:39:36 AM. Contact: ###-####. no power to some recepts, MC hanging out of wall for drinking fountain, fixture not install in 1 rm
|
Electrical Rough-In | 8/13/2007 | 8/13/2007 | 8/13/2007 | P | PART |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 8/13/2007 at 7:45:09 AM. Contact: ###-####. offices only ok to cover
|