Final | 10/5/2007 | 10/5/2007 | 10/5/2007 | P | NR |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/5/2007 at 7:52:42 AM. Contact: ###-####. not ready general contr had to replace broken countertop recepts not installed
|
Electrical Rough-In | 8/31/2007 | 8/31/2007 | 8/31/2007 | P | PASS |
Jack Frank
|
|
|
kitchen; Jared; call hour prior; Phone #: ###-#### Internet Inspection Request from: Hattie James kit r/i ok
|
Electrical Rough-In | 8/22/2007 | 8/22/2007 | 8/22/2007 | P | PASS |
Bob Reichert
|
|
|
francis Phone #: ###-#### call in advance jerod ###-#### ric ok 4 rooms
|
Electrical Rough-In | 8/20/2007 | 8/21/2007 | 8/21/2007 | A | NH |
Jack Frank
|
|
|
Steve; call for access; Phone #: ###-#### Internet Inspection Request from: Hattie James notice posted called left message
|