Final | 12/11/2007 | 12/12/2007 | 12/12/2007 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton ok to final, signed occupancy card
|
Electrical Rough-In | 11/1/2007 | 11/1/2007 | 11/1/2007 | P | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton ok to cover water feature only
|
Electrical Rough-In | 10/16/2007 | 10/17/2007 | 10/17/2007 | A | PASS |
Mike Kinnear
|
|
|
Counter/Bar Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton ok cover counter bar area only
|
Electrical Rough-In | 10/9/2007 | 10/10/2007 | 10/10/2007 | A | PASS |
Bob Reichert
|
|
|
Ceiling Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton corrections made, ok to cover ceiling only
|
Electrical Rough-In | 10/8/2007 | 10/8/2007 | 10/8/2007 | P | FAIL |
Bob Reichert
|
|
|
Ceiling re-inspect. As early as possible please. Thank you Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton called, signed corr notice stating not done, tiles still up, see some violations not corrected, asked contractor to check before calling
|
Electrical Rough-In | 10/2/2007 | 10/3/2007 | 10/3/2007 | A | FAIL |
Bob Reichert
|
|
|
Ceiling. Restaurant opens at 8:30 Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton called contractor, left corr notice, BCC ALLceiling tiles shall be removed for inspection, no low voltage shall be on grid
|
Electrical Rough-In | 9/6/2007 | 9/7/2007 | 9/7/2007 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton ric walls only ok
|