Rough-In Permanent Service | 9/12/2007 | 9/21/2007 | 9/21/2007 | A | CANC |
Bob Reichert
|
|
|
###-#### Paul CANCELLED PER PAUL WILL CALL TO SET AGAIN
|
Conference | 9/12/2007 | 9/14/2007 | 9/14/2007 | A | DONE |
Bob Reichert
|
|
|
###-#### Paul//already to r/i stage because he pulled permit with the state to begin with met owner, talked about wiring shed, see ri
|
Electrical Rough-In | 9/14/2007 | 9/14/2007 | 9/14/2007 | A | FAIL |
Bob Reichert
|
|
|
###-#### Paul//already to r/i stage because he pulled permit with the state to begin with met owner, left corr notice, nec 334.30 nm cable shall be stapled within 12" of box or 8" for single, 300.4(D) nm cable shall be 1 1/4" from edge of framing member, 230.70 shall provide service disconnect in structure, BCC shall see make-up before devices installed
|