Final | 1/21/2008 | 1/22/2008 | 1/22/2008 | A | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 1/21/2008 at 12:19:04 PM. Contact: ###-####. . 1. final ok. .
|
Electrical Rough-In | 10/29/2007 | 10/29/2007 | 10/29/2007 | P | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/29/2007 at 7:49:20 AM. Contact: ###-####.
|
Permanent Service | 9/28/2007 | 9/28/2007 | 9/28/2007 | A | PASS |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/28/2007 at 7:09:52 AM. Contact: ###-####. P/S U/G n ok
|
Permanent Service | 9/25/2007 | 9/25/2007 | 9/25/2007 | P | CANC |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 9/25/2007 at 9:00:58 AM. Contact: ###-####. . 1. should have been a rough-in for inspection of the electrode. .
|
Electrical Rough-In | 9/25/2007 | 9/25/2007 | 9/25/2007 | P | PASS |
William E Thomas
|
|
|
Scheduled by a contractor via Hello! on 9/25/2007 at 9:00:58 AM. Contact: ###-####. . 1. ok to cover with concrete. .
|
Rough-In Permanent Service | 9/19/2007 | 9/20/2007 | 9/20/2007 | A | PART |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 9/19/2007 at 5:25:03 PM. Contact: ###-####. service requires electrode garage not open. bedroom and bath area only ok
|
Rough-In Permanent Service | 9/18/2007 | 8/19/2007 | | A | |
Pat Lass
|
|
|
greg-- ###-####
|